Amercoeur Power Plants installation activities for the pressure pipes and fittings in A106, P11, P22 and P91
Client: Ansaldo Energia
Installations of 1 HRSG (250 MW) included pressure parts (A106, AISI 304, P11, P22, and P91) and carpentries.
Client: Alstom Power
850 t auxiliary pipes and fittings construction for open Gas Turbine cycles of Ain Djasser and Labreg Power Plants
Client: Ansaldo Energia
Mechanical, electrical, and instrumentation engineering. Pipes and carpentries supply, construction and installation. Installation of 18MW Steam Turbine included generator and auxiliaries. Electrical and instrumentation supply and installation.
Client: Fincantieri for ENIP Skikda
Carbon Steel, Stainless Steel, P-11, P-22 and P-91 pipes welding activities for a 700MW conventional Boiler - Dominican Rep.
Client: CONSORCIO ODEBRECHT–TECNIMONT–ESTRELLA
Pipe rack installation for the Power Plant BOP - Pavia - Italy
Client: Tecnimont
30 MW Diesel Generator installation. Mechanical and electrical activities performed all by Tema - Sanà - Yemen
Client: Ansaldo Energia
13MW steam turbine, generator, and auxiliaries installation, commissioning, and start-up. Pressure parts construction and installation. Hera Power Plant Coriano Italy
Client: Fincantieri
18MW steam turbine, generator, and auxiliaries installation. Pressure parts construction and installation. IREN Power Plant Parma Italy
Client: Fincantieri
Our welders at the Voith workshop are engaged in welding activities on the blades for the Francis' runners hydro turbines.